If the optional time quantum is provided for a selected scheduler that doesn’t require it. the program ignores that switch and For the feedback scheduling policy, the quantum is only allowed to be 1 or 2 meaning q = 1 and q = 2 quantum values from the book. respectively.
Output File Format
The output file will look similar to the input file, but will have added the process start time, time spent in wait. finish time, turnaround time and normalized turnaround time (as a float with 2 decimal points) for each of the processes. Finally it will list the mean turnaround time and the mean normalized turnaround time (also as a float with 2 decimal points).
“A”,0,3,0,0,3,3,1.00 “C”,4,4,6,2,10,6,1.50 “B”,2,6,3,5,13,11,1.83 “D”,6,5,13,7,18,12,2.40 “E”,8,2,18,10,20,12,6.00 8.80,2.55